Race-Day Pace Calculator

Enter your target finish time and how you race, and get a split target for all 8 runs and 8 stations plus a cumulative race clock — so you know exactly where you should be at every checkpoint.

Division sets the station loadings shown; it does not change the split model.

Avg run split

5:45 /km

Total running

45:57

Total stations

36:51

Roxzone budget

7:12

SegmentTargetPace / StandardRace clock
Run 11 km5:075:07
SkiErg1,000 m4:38≈2:19 /500m station avg10:39
Run 21 km5:2316:02
Sled Push50 m4:44152 kg incl. sled21:40
Run 31 km5:3727:17
Sled Pull50 m5:06103 kg incl. sled33:16
Run 41 km5:4539:01
Burpee Broad Jumps80 m5:0645:01
Run 51 km5:5350:54
Row1,000 m4:49≈2:25 /500m station avg56:38
Run 61 km5:591:02:36
Farmers Carry200 m2:162×24 kg1:05:47
Run 71 km6:041:11:51
Sandbag Lunges100 m4:3820 kg1:17:23
Run 81 km6:101:23:33
Wall Balls100 reps5:336 kg · 3.0 m1:30:00

Race clock adds a 0:54 Roxzone allowance before each station (none after Wall Balls — the race ends at your last rep). Segment targets are work time only.

Get your pace plan as a PDF — free account

The calculator is free to use right here. A free account adds the branded, printable PDF pace card.

Split targets are modeled from typical race distributions at your finish time, adjusted for your profile and transitions — they are a pacing starting point, not a guarantee. The Roxzone budget is split evenly across the 8 run-to-station transitions; real transition distances vary by venue. Division changes the loadings shown, not the split model. Station loadings are the current published standards (sled weights include the sled); always confirm against your race pack.